Recently, by the Nanjing Jie Ning investment construction of Lishui district "white horse - Yong Yang" section of the pipeline and Liyang Anshun Gas Co., Ltd. pipe network docking, the successful replacement, smooth ventilation, marks the Lishui district natural gas infrastructure construction made great achievements.
The gas pipeline from west to East Gas Pipeline South sub transmission station completed, marking the Lishui area finally access to natural gas pipeline. Since then, Nanjing Jie Ning Gas Co., Ltd. in Lishui district has pipeline gas, CNG and LNG three gas, gas and gas allocation ability has been fully protected, at the same time, to improve the atmospheric environment, and to promote the local economic development and make a positive contribution.